Floors we
have outfitted

Our own line
BUILT Strength — Commercial Grade, Without The Badge Premium
BUILT Strength is ours. Welded, finished and upholstered on our own line, in your colors. That is how a first facility gets a floor that holds up under daily commercial use instead of one that had to be compromised to fit the budget.
Free with every estimate
You See The Room Before You Buy It
The render on the left, the installed floor on the right. Same room, same plan.
Gains take timeUnder construction
Gains take timeUnder construction
Gains take timeUnder construction
Gains take timeUnder construction
What a floor costs
Rough Numbers, Openly
Starting points, not quotes. Your mix of new and BUILT Strength, your colors and your room move these — but you should not have to call to find out whether you are in the right ballpark.
One strength area, a functional trainer, dumbbells to 100 lb, a few cardio pieces and open floor.
A complete strength floor — racks, plate loaded, a selectorized circuit, benches, full dumbbell set and a cardio bank.
Multiple training zones, full cardio, turf, platforms and room for a custom color program across the floor.
Figures are typical starting points for an equipment package at that size, before delivery, installation and any custom color program. Every floor is quoted on its own.
Four Things Move The Number
How much floor you have to fill, and how much of it has to stay walkable.
Which pieces are worth buying new, and where BUILT Strength or remanufactured does the same job for less.
A full color program looks superb and costs more in both money and lead time. Worth deciding early.
Driveway or inside-and-assembled, and whether there are stairs. Send photos of the doors and we will price it.
Available on any floor, and arranged alongside the quote so you can see the monthly figure next to the outright one.
When to start
Five To Six Months Out
Start the estimate. Room for the plan, the changes, the build and the install without any of it being rushed.
Custom color minimum. Custom color, pad and logo orders are built to order and cannot be pulled forward. Treat twelve weeks as the floor, not the target.
New equipment lead time. Most of the range is in stock. Some items run two to four weeks and occasionally six to eight.
Still call. Some in-stock items turn around same day. We will tell you honestly what is achievable for your date.
How ordering works
Four Stages
- 1 Tell us the space Square footage, ceiling height, doors and stairs. A rough sketch is enough.
- 2 Estimate and render Equipment list, quote, and a 3D render of the room. Free, and yours to keep.
- 3 Adjust until it fits Swap machines, change the mix, move things around. The stage to change your mind.
- 4 Delivered and installed Into the room, assembled, tested, and the packaging leaves with us.
Gains take timeUnder construction
Questions We Get On Day One
The things owners ask us before anything is ordered.
Yes. Send the square footage, your target opening date and a rough idea of budget, and we come back with a full equipment list and a quote. There is no charge and no obligation to order.
Yes, it comes with the estimate. You see the room laid out with real spacing before anything is ordered, and you keep it either way.
Our own line of commercial strength equipment — 11-gauge steel, welded and upholstered on our line in your colors, across three series: OG, Fractal and Infinite. Commercial grade without the badge premium. See the whole line.
Five to six months is the guideline for a full floor. Most of the range is in stock, some items run two to four weeks and occasionally six to eight, and custom color, pad or logo orders take twelve to fourteen weeks. Later than that is still worth a call.
The starting points on this page are typical equipment packages by size, before delivery, installation and custom color. The mix of new, BUILT Strength and remanufactured moves the number more than anything else, and we will be straight with you about all of it on the call.
Yes. We will go through the options with you alongside the quote so you can see the monthly figure against the outright one. See commercial financing.
Most commercial floors are a mix. Remanufactured is the same commercial-grade frame stripped, repaired, tested and rebuilt, at a fraction of new — so the budget covers more of the room. We will tell you which pieces are worth buying new and which are not.
New equipment carries a full year of parts and labor plus lifetime coverage on the frame. Remanufactured carries a full year of parts and labor, backed by us. Extended coverage is available on both and has to be bought before the equipment ships. Full coverage details.
Nationwide, every ZIP code. Driveway Delivery brings it to you, and Inside Delivery & Assembly puts it in the room, builds it, tests it and takes the packaging away. Stairs are quoted separately — send photos of the doors and stairwell and we will price it.
Square footage, ceiling height, a floor plan or rough sketch, your target opening date, and a budget range. Anything else we can work out together.
Tell Us About Your Space
Six years in business. Millions of pounds of equipment installed.
